
Storage shift begins: SECI floats bids for 2,000 MW solar with co-located battery systems; projects to support India’s 2030 grid targets
SECI has invited bids for 2,000 MW of grid-connected solar projects with co-located energy storage, aiming to stabilize India’s renewable energy grid. Each project requires ...

India’s renewable energy capacity triples in a decade, reaches 232 GW; eyes 500 GW by 2030
India’s renewable energy sector has experienced substantial growth, increasing from 75.52 GW in 2014 to 232 GW. Solar power has been a key driver, surging ...